PILE DRIVING

Project: Coal Unloading Facility Substructure
Client: Ameren UE



This project provided support to a new coal unloading facility and required the installation of battered and vertical-spliced pipe pile with various concrete bents, one being 65 feet tall and approximately 5 feet in diameter.

The final position of the foundation anchor bolts had to be precise, requiring exact engineering layout and execution by the Artisan personnel.